Configuration and migration

Equipment arrives configured, and data moves according to plan

Configuration means preparing equipment before handout or installation: image (a ready-made set of OS and applications), settings, tagging, testing. Migration means moving data and services off old systems according to a plan, with checks and a way back. Equipment is prepared before deployment, and migration runs once the new systems are ready; both follow a plan agreed with you.

Write an email

123
  1. Old systems
  2. New systems, rollback plan
  3. Tagged batch, sample first

What’s included

  • Workplace preparation OS image with applications, basic settings, joining the corporate domain, disk encryption.
  • Apple devices Enrollment in the management system through Apple Business, so devices can be set up remotely.
  • Tagging and inventory Asset tags, serial numbers, a list for your records.
  • Servers and network before installation Firmware, disk setup, configurations, a check before shipping.
  • Workplace transfer User data, settings and profiles from old computers to new ones.
  • Service migration Data between storage systems, virtual machines, mail and files, including from unsupported systems. This is a separate project, not part of supplying and deploying new equipment.

Levels of device preparation

  • No preparation

    Factory configuration; set up on site.

    Deployment and integration

  • Tagging and kitting

    Tags, inventory and a kit for each workplace.

  • Full configuration

    The device is ready to work straight out of the box.

How the work goes

  1. Survey

    What needs preparing and what moves, how systems depend on each other, when work can be stopped.

  2. Plan

    Reference image and settings, schedule, rollback plan.

  3. Pilot

    A configured sample device or a trial migration of part of the data, checked by you.

  4. Main stage

    The device batch or the migration, on schedule, with a check after each step.

  5. Close-out

    Device list, report and documentation.

What you get

  • A migration plan and schedule
  • A rollback plan if something goes wrong
  • A device list with serial numbers and tags
  • Close-out documentation

What to prepare

  • A reference image or list of applications
  • Your asset tags, if you have them
  • For Apple devices, access to your organization’s Apple Business
  • Times when systems can be taken offline
  • Access rules for the systems being moved

Who does the work

DIXI-CENTER specialists do most of the work. For highly specialized tasks, we bring in specialist integrators, distributors with technical expertise or the manufacturer’s engineers.

How we share work with partners

Describe the task and we’ll discuss the migration

Send us an email and we’ll work out the details and propose a plan. It helps to include:

  • what moves: workplaces, servers, storage, mail
  • how many devices or how much data
  • acceptable downtime and preferred timing
  • whether tagging and inventory are needed