Deployment and integration
Equipment on site, installed, tested and documented
Deployment takes you from delivery to a system you can actually work with. We agree scope, timing and access in advance and make sure nothing falls through the cracks between delivery and go-live.
- Installation
- Connection
- Configuration
- Acceptance tests
What’s included
- Receiving and installation Post-delivery check, mounting in the rack or on site, cabling, connection to existing power.
- Connection Basic network settings and a check of links to other network equipment.
- Configuration Systems, policies, applications and connected devices, up to “ready to work”.
- Integration Connection to your user accounts, backup and monitoring.
- Acceptance tests The work is signed off based on the test results.
- Knowledge transfer Documentation and walkthroughs for your IT team.
Formats
-
Installation only
Mounting and connection; configuration by your team.
-
Full deployment
Installation, configuration, integration, tests and documentation.
-
Several sites
Branches and offices on one plan and schedule.
How the work goes
-
Site survey
Network, premises, constraints.
-
Preparation
Date, access, agreed plan.
-
Work
Installation and configuration according to plan, at agreed times to keep downtime to a minimum.
-
Testing and acceptance
Tests, stage acceptance, documentation.
What you get
- A tested, documented system
- A diagram of connections and settings
- Acceptance test results
- Walkthroughs and documentation for your staff
What to prepare
- A responsible person on your side
- Access to the premises and an agreed schedule
- Network (IP) addresses, licenses and accounts
- Fresh backups before work starts
- Your security and access rules for the infrastructure
Who does the work
DIXI-CENTER specialists do most of the work. For highly specialized tasks, we bring in specialist integrators, distributors with technical expertise or the manufacturer’s engineers.
Describe the task and we’ll discuss the deployment
Send us an email and we’ll work out the details and suggest a format. It helps to include:
- what equipment and how much
- where it goes: addresses, rooms, racks
- what’s already running and what it needs to integrate with
- access restrictions and preferred timing