Data Center

Server infrastructure built to grow

Servers, enterprise storage, backup and recovery, virtualization and data center networking. We design it, supply it, deploy it in your server room and support it.

Write an email What it includes

The problems we solve

  • Growth without a rebuild

    Compute, memory and storage should grow step by step. We build in headroom and a growth path from day one.

  • Service availability

    What happens if a server, disk, switch or power feed fails? We plan redundancy where it’s needed.

  • A backup that restores

    Having a backup isn’t enough – it has to restore within the time you need. Recovery planning is part of the solution.

  • Aging equipment

    We move workloads to new platforms and reduce the number of servers: with virtualization, one physical server runs several virtual ones.

  • Components that fit together

    Servers, storage, network and power are chosen together, not one by one, so there are fewer surprises at launch.

  • Monitoring and support

    Responsibilities for monitoring and support after launch are agreed in advance.

What the solution includes

Partners

From a small server room to several sites

Three typical scales to start the conversation. The exact makeup is set by your workloads and availability requirements.

  1. Small office or branch

    A few servers and shared storage.

    Typical tasks
    File and accounting services, email, remote access.
    What matters
    Simple management, a backup, protection from power failures.
    What we look at
    Headroom for growth, space and cooling, ease of support.
  2. Enterprise server room

    Virtualized infrastructure with several servers.

    Typical tasks
    Virtualization, databases, corporate applications, server redundancy.
    What matters
    Availability, storage performance, fast recovery.
    What we look at
    Network layout, load distribution, rack power and cooling.
  3. Several sites

    A primary and a standby site.

    Typical tasks
    Disaster recovery, copying data between sites, moving workloads.
    What matters
    How long recovery can take and how much data you can afford to lose.
    What we look at
    Links between sites, consistency of equipment, switchover plan.

Typical projects

  • Server consolidation

    Fewer physical machines, simpler management and maintenance.

  • Infrastructure modernization

    Moving from legacy platforms to current ones with minimal interruption.

  • Virtualization

    Moving workloads to virtual servers.

  • Hyperconverged infrastructure

    Server drives are pooled into shared storage with one point of management, so no separate storage system is needed; the cluster grows by adding servers.

  • Standby site and recovery

    A design that brings services back after a failure.

  • Storage expansion

    Adding capacity and performance as planned, with minimal interruption.

  • Preparing for new servers

    Uninterruptible power supplies (UPS) and network equipment for new servers: we supply them, install them in the rack and configure them.

How the work goes

  1. Task and workload

    We map out services, data volumes and availability requirements.

  2. Design

    We define the servers, storage, network and power, and how they connect.

  3. Supply

    We agree the specification and deliver the equipment for the server room.

  4. Deployment and migration

    We install, configure and move workloads.

  5. Support

    We support the infrastructure after launch.

What the cost depends on

We price each server room on its own. These are the things that affect it most.

  • Number of services and their resource needs
  • Required availability and redundancy
  • Data volume and growth rate
  • State of the existing server room: power, cooling, network
  • Scale of workload migration
  • Level of support after launch
  • Timeline and number of sites

Tell us about your infrastructure

Send us an email and we’ll come back with a few questions. It helps to include:

  • which services and systems run today
  • data volume and growth rate
  • availability and recovery requirements
  • state of the server room: space, power, cooling
  • whether you need migration from old equipment
  • timeline and budget limits